Prev Next
īģŋ

(ii)

Batten: Garjan

5 x 10'-0" x 3" x 2" = 2.08 cft

Add 5% wastage 0.10 cft

 

 

 

 

 

 

 

 

2.18 cft

@

Tk.

2,000.00

per cft

 

 

 

 

Using 8 times

 

Tk.

250.00

per cft

=

Tk.

545.00

(iii)

16 BWG M.S. sheet 110 sft

 

 

 

 

 

 

 

 

= 280.5 Ibs

@

Tk.

27.44

per Ibs

 

 

 

 

Using 30times

@

Tk.

0.91

per Ibs

=

Tk.

255.26

(iv)

Bamboo props in/c bracket: 25 nos

@

Tk.

120.00

each

 

 

 

 

Using 8 times

@

Tk.

15.00

each

=

Tk.

375.00

(v)

Nails: 1 kg

@

Tk.

65.00

per kg

=

Tk.

65.00

(vi)

Labour for shuttering in/c making, placing & removing:

 

 

 

 

 

 

 

 

10' - 0" x 10' - 0" = 100 sft

 

 

 

 

 

 

 

 

4 x 10'-0" x 4.5"= 15 sft

 

 

 

 

 

 

 

 

= 115 sft

@

Tk.

15.00

per sft

=

Tk.

1,725.00

(vii)

Supplying & fixing rupban or equivalent sheet and necessary hessian tap for making

 

 

 

 

 

 

 

 

shutter water-tight sufficiently. 115 sft

@

Tk.

2.50

per sft

=

Tk.

287.50

(viii)

Curing for 28 days for surface area 115 sft

@

Tk.

2.67

per sft

=

Tk.

307.05

 

 

 

 

 

Total

=

Tk.

4,028.56

 

 

 

 

 

Cost per sft

=

Tk.

35.03

 

 

 

 

 

Cost per sqm

=

Tk.

377.06

C-7

CORNICE, DROP-WALLS, RAILINGS, LOUVER and FINS etc. using WOODEN shutter

 

 

 

 

 

 

 

 

Assuming 3" thick 10'-0" x 3'-0" size dropwall

 

 

 

 

 

 

 

 

Shuttering Area: 62.5 sft

 

 

 

 

 

 

 

(i)

Planks and batten

 

 

 

 

 

 

 

 

2 x 10'-0" x 3'-0" x 0'-1" = 5.00 cft

 

 

 

 

 

 

 

 

2 x 3 x 3'-0" x 0'-3" x 0'-2" = 0.75 cft

 

 

 

 

 

 

 

 

1 x 10'-0" x 5" x 1"= 0.34 cft

 

 

 

 

 

 

 

 

3 x 1'-6" x 0'-3" x 0'-2" = 0.19 cft

 

 

 

 

 

 

 

 

= 6.28 cft

 

 

 

 

 

 

 

 

Add 5% wastage = 0.31 cft

 

 

 

 

 

 

 

 

6.59 cft

@

Tk.

500.00

per cft

 

 

 

 

Using 8 times

@

Tk.

62.50

per cft

=

Tk.

411.88

(ii)

Bamboo struts in/c inclined supports 8.0 nos

@

Tk.

73.85

each

 

 

 

 

Using 8 times

@

Tk.

9.23

each

=

Tk.

73.84

(iii)

Nails and wires 0.5 kg

@

Tk.

65.00

per kg

=

Tk.

32.50

(iv)

Labour for shuttering in/c making, placing & removing:

 

 

 

 

 

 

 

 

2 x 10'-0" x 3'-0" = 60 sft

 

 

 

 

 

 

 

 

1 x 10'-0" x 3"= 2.5 sft

 

 

 

 

 

 

 

 

= 62.5 sft

@

Tk.

15.00

per sft

=

Tk.

937.50

(v)

Supplying & fixing rupban or equivalent sheet and necessary hessian tape for

 

 

 

 

 

 

 

 

making water-tight sufficiently 62.5 sft

@

Tk.

2.50

per sft

=

Tk.

156.25

(vi)

Curing for 28 days for surface area 62.5 sft

@

Tk.

2.67

per sft

=

Tk.

166.88

 

 

 

 

 

Total

=

Tk.

1,778.85

 

 

 

 

 

Cost per sft

=

Tk.

28.46

 

 

 

 

 

Cost per sqm

=

Tk.

306.34

C-8

SUNSHADE using WOODEN shutter

 

 

 

 

 

 

 

 

Assuming 3" thick 10'-0" x 3'-0" size sunshade

 

 

 

 

 

 

 

 

Shuttering area: 34 sft

 

 

 

 

 

 

 

(i)

Planks and batten

 

 

 

 

 

 

 

 

1 x 10'-0" x 3'-0" x 0'-1.5" = 3.75 cft

 

 

 

 

 

 

 

 

2 x 3'-1.5" x 0'-3" x 0'-1.5" = 0.20 cft

 

 

 

 

 

 

 

 

1 x 10'-0" x 3" x 1.5"= 0.30 cft

 

 

 

 

 

 

 

 

4 x 4'-0" x 0'- 2" x 0'-2" = 0.44 cft

 

 

 

 

 

 

 

 

= 4.69 cft

 

 

 

 

 

 

 

 

Add 5% wastage = 0.23 cft

 

 

 

 

 

 

 

 

4.92 cft

@

Tk.

500.00

per cft