Using 8 times

 

@

Tk.

62.50

per cft

=

Tk.

307.50

  1.  

Bamboo prop in/c inclined supports

8.0 nos

@

Tk.

120.00

each

 

 

 

 

 

Using 8 times

@

Tk.

15.00

each

=

Tk.

120.00

  1.  

Nails and wires

0.3 kg

@

Tk.

65.00

per kg

=

Tk.

19.50

  1.  

Labour for shuttering in/c making, placing & removing:

 

 

 

 

 

 

 

 

 

1 x 10'-0" x 3'-0" =

30 sft

 

 

 

 

 

 

 

 

(3'-0" +10'-0" + 3'-0") x 3" =

4 sft

 

 

 

 

 

 

 

 

=

34 sft

@

Tk.

15.00

per sft

=

Tk.

510.00

  1.  

Supplying & fixing rupban or equivalent sheet and necessary hessian tape for

 

 

 

 

 

 

 

 

 

making water-tight sufficiently

34 sft

@

Tk.

2.50

per sft

=

Tk.

85.00

  1.  

Curing for 28 days for surface area

34 sft

@

Tk.

2.67

per sft

=

Tk.

90.78

 

 

 

 

 

 

Total

=

Tk.

1,042.00

 

 

 

 

 

 

Cost per sft

=

Tk.

30.65

 

 

 

 

 

 

Cost per sqm

=

Tk.

329.92

C-9

STAIR CASE SLAB and STEPS using WOODEN shutter

 

 

 

 

 

 

 

 

 

Assuming 8'-9" long & 4'-0" wide stair

 

 

 

 

 

 

 

 

 

Shuttering Area: 72.6 sft 72.5

 

 

 

 

 

 

 

 

 

8'- 9" x 4'-0" x 0'-6" =

17.50 cft

 

 

 

 

 

 

 

 

1/2 x 9 x 4'-0" x 0'-10" x 0'-6" =

7.56 cft

 

 

 

 

 

 

 

 

=

25.06 cftconcrete

 

 

 

 

 

 

 

(i)

Planks and batten

 

 

 

 

 

 

 

 

 

1 x 8'-9" x 4'-0" x 0'-1.5" =

4.38 cft

 

 

 

 

 

 

 

 

9 x 4'-0" x 0'-6" x 0'-1.5" =

2.25 cft

 

 

 

 

 

 

 

 

2 x 8'-9" x 1'-1.5" x 1.5" =

2.46 cft

 

 

 

 

 

 

 

 

5 x 4'-0" x 3" x 2"=

0.83 cft

 

 

 

 

 

 

 

 

2 x 5 x 1'-1.5" x 3" x 2" =

0.47 cft

 

 

 

 

 

 

 

 

1 x 8'-9" x 3" x 2" =

0.36 cft

 

 

 

 

 

 

 

 

 

10.75 cft

 

 

 

 

 

 

 

 

Add wastage 5%=

0.54 cft

 

 

 

 

 

 

 

 

 

11.29 cft

 

Tk.

500.00

per cft

 

 

 

 

 

Using 8 times

@

Tk.

62.50

per cft

=

Tk.

705.63

(ii)

Bamboo props in/c bracket:

10 nos

@

Tk.

120.00

each

 

 

 

 

 

Using 8 times

@

Tk.

15.00

each

=

Tk.

150.00

(iii)

Nails:

0.54 kg

@

Tk.

65.00

per kg

=

Tk.

35.10

(iv)

Labour for shuttering in/c making, placing & removing:

 

 

 

 

 

 

 

 

 

1 x 8'-9" x 4'-0" =

35 sft

 

 

 

 

 

 

 

 

9 x 4'-0" x 0'-6" =

18.00 sft

 

 

 

 

 

 

 

 

2 x 8'-9" x 1'-1.5" =

19.60 sft

 

 

 

 

 

 

 

 

=

72.6 sft

@

Tk.

15.00

per sft

=

Tk.

1,089.00

(v)

Supplying & fixing rupban or equivalent sheet and necessary hessian tape for

 

 

 

 

 

 

 

 

 

making water-tight sufficiently

72.6 sft

@

Tk.

2.50

per sft

=

Tk.

181.50

(vi)

Curing for 28 days for surface area

72.6 sft

@

Tk.

2.67

per sft

=

Tk.

193.84

 

 

 

 

 

 

Total

=

Tk.

2,161.23

 

 

 

 

 

 

Cost per sft

=

Tk.

29.77

 

 

 

 

 

 

Cost per sqm

=

Tk.

320.44

C-10

FOOTINGS OF COLUMN at plinth level using STEEL shutter

 

 

 

 

 

 

 

 

 

Assuming 8'-0" x 8'-0" Base (D= 21", d=15")

 

 

 

 

 

 

 

 

 

Shuttering Area: 40.63 sft 40.63

 

 

 

 

 

 

 

  1.  

1.5" x 1.5" x 3/16" M.S. angle for frame:

 

 

 

 

 

 

 

 

 

2 x 2 x 8'-0=

32.00 rft

 

 

 

 

 

 

 

 

2 x 2 x 8'-3"=

33 rft

 

 

 

 

 

 

 

 

2 x 4 x 1'-3"=

10.00 rft

 

 

 

 

 

 

 

 

 

75.00 rft

 

 

 

 

 

 

 

 

Add 5% wastage=

3.75 rft

 

 

 

 

 

 

 

 

 

78.75 rft

 

 

 

 

 

 

 

 

@ 1.79 Ibs per rft =

140.96 Ibs

@

Tk.

24.94 per Ib

=

Tk.

3,515.54

  1.  

1" x 3/16" F.I. bar for stiffner (9" c/c) in frame :

 

 

 

 

 

 

 

 

 

4 x 5 x 1'-3"=

25.00 rft