(ix)

Shuttering

Shuttering cost for 4 x 30'-0" x 4'-0" = 480 sft

Curing for 28 days for surface area 1380.00 sft @

cost per sft

Tk. 2.67

per sft

=

=

=

Tk.
Tk.
Tk.

25.68

12,326.40

3,684.60

 

Total

Cost per sft Cost per sqm

=

=

=

Tk.
Tk.
Tk.

16,011.00

33.36

359.09

C-12

FOUNDATION BEAM using STEEL shutter

 

 

 

 

 

 

Assuming size of beam: 20'-0" x 3'-0" x 1'-6"

 

 

 

 

 

 

Shuttering Area: 120 sft

 

 

 

 

 

(i)

1.5 " x 1.5" x3/16" angle for frame:

 

 

 

 

 

 

2 x 2 x 20'-0"= 80.00 rft

 

 

 

 

 

 

2 x 3 x 2 x 3'-0"= 36.00 rft

 

 

 

 

 

 

116.00 rft

 

 

 

 

 

 

Add 5% wastage= 5.80 rft

 

 

 

 

 

 

121.80 rft

 

 

 

 

 

 

@ 1.79 Ibs per rft = 218.022 Ibs @

Tk. 24.94

per Ib

=

Tk.

5,437.47

(ii)

1" x 3/16" F.I. bar for stiffner and tie between side shutter.

 

 

 

 

 

 

2 x 20'-0"= 40.00 rft

 

 

 

 

 

 

2 x 3 x 6 x 3'-0"= 108.00 rft

 

 

 

 

 

 

1 x 5 x 1'-10"= 9.20 rft

 

 

 

 

 

 

157.20 rft

 

 

 

 

 

 

Add 5% wastage= 7.86 rft

 

 

 

 

 

 

165.06 rft

 

 

 

 

 

 

@ 0.64Ibs per rft = 105.64 Ibs @

Tk. 24.94

per Ib

=

Tk.

2,634.66

(iii)

16 BWG steel sheet for covering steel frame:

 

 

 

 

 

 

2 x 20'-0" x 3'-0"= 120.00 sft

 

 

 

 

 

 

Add 5% wastage= 6 sft

 

 

 

 

 

 

126.00 sft

 

 

 

 

 

 

@ 2.44 Ibs per sft= 307.44 Ibs @

Tk. 27.44

per Ibs

=

Tk.

8,436.15

(iv)

Fabrication cost of steel shutter: 120.00 sft @

Tk. 75.00

per sft

=

Tk.

9,000.00

(v)

Cost of nuts, bolts, J-hooks etc. 4.00 kg @

Tk. 160.00

per kg

=

Tk.

640.00

 

 

 

Total

=

Tk.

26,148.28

 

Considering 30 times use

 

 

=

Tk.

871.61

(vi)

1.5" dia M.S. pipe for inclined support

 

 

 

 

 

 

2 x 5x 10'-0" = 100 rft @

Tk. 115.00

per rft

=

Tk.

11,500.00

 

Considering 50 times use

 

 

=

Tk.

230.00

(vii)

Labour cost for fitting fixing steel shutter and props in position and removing after concreting etc.

 

 

 

 

 

 

2 x 20'-0" x 3'-0"= 120.00 sft @

Tk. 15.00

per sft

=

Tk.

1,800.00

(viii)

Hessian for making

 

 

 

 

 

 

shutter water-tight 120.00 sft @

Tk. 1.25

per sft

=

Tk.

150.00

(ix)

Cost for support against sides

 

 

=

Tk.

50.00

(x)

Curing for 28 days for surface area 150.00 sft @

Tk. 2.67

per sft

=

Tk.

400.50

 

 

Grand total

 

=

Tk.

3,502.11

 

 

 

Cost per sft

=

Tk.

29.18

 

 

 

Cost per sqm

=

Tk.

314.09

C-13

PADESTALS, COLUMN CAPITALS, LIFT WALLS and WALLS using STEEL shutter

 

 

 

 

 

 

Assuming 10'-0" x 12" x 12" Column

 

 

 

 

 

 

Shuttering Area: 40 sft

 

 

 

 

 

  1.  

1.5" x 1.5" x 3/16" angle for frame

 

 

 

 

 

 

4 x 2 x 10'-0"= 80.00 rft

 

 

 

 

 

 

2 x 3 x 1'-4"= 7.98 rft

 

 

 

 

 

 

2 x 3 x 1'-0"= 6.00 rft

 

 

 

 

 

 

93.98 rft

 

 

 

 

 

 

Add 5% wastage = 4.699 rft

 

 

 

 

 

 

= 98.68 rft

 

 

 

 

 

 

1.79 Ibs per rft = 176.64 Ibs @

Tk. 24.94

per Ib

=

Tk.

4,405.40

  1.  

1" x3/16" F.I. bar for stiffner

 

 

 

 

 

 

2 x 8 x 1'-4"= 21.28 rft