NEED4ENGINEER
ব্লগ
ক্যালকুলেশন
নাম-ঠিকানা
এস্টিমেট
ম্যাটেরিয়াল
অন্যান্য
কুইজ
গ্যালারী
প্রশ্ন
চেকশীট
Search by keyword
Fill the form and save
before, during and after shuttering works
Details
Approval of Structural Designer
Revision #/ Date
Shuttering Location
Fair Face Approval
Slab Outline
Placement of Shutter Column/ Shear Wall/ Foundation Edge
Placement of Shutter Grid line checking & Kicker
Placement of Shutter Vertical & Horizontal Alignment (Shawl)
Placement of Shutter Clear Cover (All sides)
Placement of Shutter Cleaning & Oiling of Shutter
Placement of Shutter Fixing of Gasket/Foam at Joint
Placement of Shutter Fixing of bolt & shutter clip/P-cone tightly
Placement of Shutter Adjustment of Vertical alignment
Placement of Shutter Slab/Beam
Placement of Shutter Props Placement Bed
Placement of Shutter Props/ Runner Spacing
Placement of Shutter Mango Plank/ Perlin/ Runner Spacing
Placement of Shutter Level/Depth
Placement of Shutter Reference Level for Casting Top
Placement of Shutter Cross Bracing at Props
Placement of Shutter Vertical Alignment of Props
Placement of Shutter Cleaning & Oiling of Plain Sheet
Placement of Shutter Clear Cover (Top, Bottom & Sides)
Leak Proofs
Safety Access
Safety Light
Safety Rain Protection
Safety Fencing with Hessian Cloth
Safety Safety Gears
Submit Form
need4engineer.com
, All right reserved.
Designed By
HTML Codex