Civil Quiz 20
The cross-section of a standard fillet is a triangle whose base angles are
Over-consolidation of soils is caused due to
Simple connections are used to transmit
The Overall in-charge of an organisation at the site responsible for the execution of the works, is
A hemi sphere is placed on H.P on its base a section plane which is perpendicular to H.P and inclined to V.P and cutting the hemisphere the section will be
Submersible pumps require high maintenance.
Bulking of sand is caused due to
Contour lines cross a watershed or ridge line at _____
under which rule of government, guidelines for solid waste management are followed today?
Cross staff is an instrument used for
The camber of road should be approximately equal to
The pressure of the liquid flowing through the divergent portion of a venturimeter
An aggregate is said to be
For a liquid having mass 2000 kg and volume 2.5 m3. Calculate mass density.
When body or matter flows from one point to another point on application of shear force, it is called
Determination of flow increase is used for the monitoring of ___________
The most efficient cross-section of sewers in a combined sewerage system is
To perform the initial setting time test, the water is added to the cement at the rate of
The boundary of water of a still lake, represents
In the gravitational system, normally Water requirements is
Improper curing results in
The section plane is perpendicular to H.P and inclined to V.P the top view of section if section is a line. It______________________xy line.
A harbour is a place where
If the permissible compressive stress for a concrete in bending is C kg/m2 , the modular ratio is
The stretcher bond in brick masonry can be used only when the thickness of wall is
For an actual reaction turbine, what should be the angle beta, such that the loss of kinetic energy at the outlet is to be minimum?
what is the definition of ecological footprint?
The expected out turn of 2.5 cm cement concrete floor per mansion per day
P.V.pipes can withstand pressure bead of water upto
Consider the following features/factors: 1. Projects are of the non-repetitive type 2. Time required need not be known 3. Time required is known precisely 4. Events have been established for planning 5. Emphasis is given to activities ofproject PERT
The uniformity co-efficient of soil is defined as the ratio of