1 10" brick work1;6
2 rcc Concrete Ratio 1:3:6 s sand50%,l sand50%(100 cft)
3 Estimate for Cast-In-Situ Pile The diameter of the pilot is 18". A total of 8 16mm diameter rods were used in the pilot from top to bottom. The spiral is done with a 10mm rod. Spiral spacing 4 “C / C on the first L / 4 and the last L / 4. The rest must hold 6” C / C.
4 Supplying, fitting and fixing Aluminium Swing door with spandrel (Bronze colour) 4'-0" X 6'-10"
5 Supplying, fitting and fixing aluminium sliding window frame and shutter (S.S. colour) 5'-0" X 4'-6"
6 Supplying, fitting and fixing aluminium top hung / casement window (S.S. colour) 3'-0" X 4'-0"
7 Minimum 1/2" thick cement plaster (1:4) with neat cement finishing to plinth walls
8 For 1/2" thick cement plaster (1:6) to walls
9 For 3/4" thick cement plaster (1:6) to walls
10 White washing: 3 coats
11 Cement paint 3 coats (one coat is for priming)
12 Applying 3-coat of weather coat in exterior wall surface
13 Painting to doors and windows frame and shutters with synthetic enamel paint two coats over a coat of priming
14 French polishing 3 coats
15 Wood varnishing with varnish (Matt)
  • « Previous
  • Next »
  • ‹
  • 1
  • 2
  • 3
  • 4
  • 5
  • ›

logo
Quick Links
  • Calculation
  • Mathpad
  • Estimate
  • Blogs
  • Quiz
About
  • Vision
  • History
  • Our Team
Help Center
  • Ask
  • Privacy
  • Terms
Contact Us
  • [email protected]
  • 096 3814 2747

Need4engineer © 2011–2025. All rights reserved.

Design: Need4engineer team