NEED4ENGINEER.COM , ২০১১ সাল থেকে অলাভজনক ভাবে নির্মাণ কাজের বিভিন্ন বিষয় নিয়ে সেবা দিয়ে যাচ্ছে। এ্যাড না দেখতে লগিন করুন
Prev Next


Grand Total = Tk. 6,901.47

Rate per kg = Tk. 138.03

Say, Tk. 138 .00 per kg

 

Item No.- 08.4

Fabrication and supplying Fan hook of 5/8" dia M.S. rod in/c fitting fixing in RCC. Considering 1 No. fan-hook

  1. 5/8" dia long M.S. rod 3.00 rft

= 2.01 Ibs @ Tk. 27.44 per Ib = Tk. 55.15

  1. Fabtication & fitting fixing in position LS = Tk. 38.40

Sub - Total = Tk. 93.55

Profit 10.00% = Tk. 9.36

Overhead 3.50% = Tk. 3.27

Total = Tk. 106.18

Add VAT with adjustment factor 1.06383 6.00% = Tk. 6.78

Grand Total = Tk. 112.96

Rate per No. = Tk. 112.96

=

Say, Tk. 113 .00 per no

 

Item No.- 08.5.1

Supplying, fitting and fixing Ribbed (with non centre bulb) PVC water stopper of width approx. 250 mm and approx 9 mm thick, for immovable (non working) RCC joints, with 1.5" x 2.5" wooden batten at the top and bottom, binding with GI wire etc. Break-up for 20 rft Work

  1. Water stopper in/c 5% wastage 21.00 rft @ Tk. 160.00 per rft = Tk. 3,360.00
  2. Wood (using 3 times)

2 x 20'-0" x 1.5" x 2.5" = 1.00 cft

Wastage 5% = 0.05 cft

1.05 cft @ Tk. 500.00 per cft = Tk. 175.00

3. Carpentry work

  1. Carpenter 0.20 no @ Tk. 600.00 each = Tk. 120.00
  2. Helper 0.40 no @ Tk. 390.00 each = Tk. 156.00

4. Placing and removing wooden bit in/c cleaning RCC surface

  1. Mason 1.00 no @ Tk. 500.00 each = Tk. 500.00
  2. Ordinary Labour 2.00 nos @ Tk. 320.00 each = Tk. 640.00

5. Wastage of RCC work LS = Tk. 61.72

6. G.I. Wire, nails etc. LS = Tk. 16.25

7. Tools and plant, sundries etc. LS = Tk. 106.67

Sub - Total = Tk. 5,135.64

Profit 10.00% = Tk. 513.56

Overhead 3.50% = Tk. 179.75

Total = Tk. 5,828.95

Add VAT with adjustment factor 1.06383 6.00% = Tk. 372.06

Grand Total = Tk. 6,201.01

Rate per rft = Tk. 310.05

Rate per rm = Tk. 1,017.27

Say Tk. 1,017 .00 per meter

 

Item No.- 08.5.2

Supplying, fitting and fixing Ribbed (with centre bulb) PVC water stopper of width approx. 250mm and approx 9mm thick, for immovable Break-up for 20 rft work

  1. Water stopper in/c 5% wastage 21.00 rft @ Tk. 160.00 per rft = Tk. 3,360.00
  2. Wood (using 3 times)

2 x 20'-0" x 1.5" x 2.5" = 1.00 cft

Wastage 5% = 0.05 cft

1.05 cft @ Tk. 500.00 per cft = Tk. 175.00

3. Carpentry work

  1. Carpenter 0.20 no @ Tk. 600.00 each = Tk. 120.00
  2. Helper 0.40 no @ Tk. 390.00 each = Tk. 156.00

4. Placing and removing wooden bit in/c cleaning RCC surface