Sub - Total = Tk. 10,001.07

Profit 10.00% Tk. 1,000.11
Overhead 3.50% Tk. 350.04
Total = Tk. 11,351.22

Add VAT with adjustment 1.06383 6.00% Tk. 724.55

Grand Total = Tk. 12,075.77

Say, Tk. 12,076 . 00 each

Item No.- 09.24.4

Analysis Rate for 18"X18" dia Pre-cast Pile of Splicing Joint

Pile SIZE 18 X 18 inch

thickness, Length,ft breadth / depth

inch wing,ft

0.5 1.5 1.5 1/2" plate

0.25 1.5 0.66 0.66 1/4" plate

0.25 0.25 0.25 angle

dowel dia 25 mm = 0.984252 in 0.0012 Mton/ft

U-bar 20 mm = 0.7874016 in 0.0008 Mton/ft

 

 

 

 

 

 

 

 

 

 

 

 

Analysis of PWD SoR 2018 for Civil Works 213

1/4" thick M.S. plate for jacket

1" dia Hole in 1/2" M.S plate

1/2 th MS Plate Grinding to V bevel top & bott

Cutting by oxy-ace of 1/2" M.S plate, top & bott plate

1/2" thik M.S Plate, top & bott

 

Item Description

Local carriage & sundry

Helper

Skilled labor

Foreman

Labor charges for placing fitting in position

Corner Angles

U bolt to 1/2"th bed plates

1/4"th C plate to 1/2"th bed plate

1/4"th C plate (jacket)

top & bott plate

Arc welding

3"x3"x1/4" Angle at Corners

0.25

0

0.5

0.5

0.5

 

thickness, inch

 

 

 

 

0.25

0.25

0.25

0.25

0.50

 

0.25

2.82

0

1.5

1.5

1.5

 

Length (ft)

 

 

 

 

 

1.417

0.75

5.32

1.32

5.32

 

1.417

0.66

0

1.5

1.5

1.5

 

Width (ft)

 

 

 

 

 

 

 

 

 

 

 

0.25

4

1

2

2

2

 

Nos

 

0.5

0.25

0.125

 

8

2

2

2

1

 

4

7.44

2.00

12.00

12.00

4.50

 

Quantity

 

 

 

 

 

11.34

1.50

10.64

2.64

5.32

 

5.67

0.00

 

 

 

0.00

 

Add

wastage

 

 

 

 

 

 

0

0

0

0

 

0

7.44

2.00

12.00

12.00

4.50

 

Total
Quantity

 

 

 

 

 

11.336

1.5

10.64

2.64

5.32

 

5.668

sft

nos

rft

rft

sft

sft

Unit

 

 

 

 

 

rft

rft

rft

rft

rft

 

rft

 

 

 

 

 

kg/rft

 

 

 

 

 

 

 

 

 

 

 

 

0.1551

 

 

 

0.1875

vol,cft

 

 

 

 

 

 

 

 

 

 

 

0.0566

0.03

 

 

 

0.0417

ton

wt

0.108

 

 

 

 

 

 

 

 

 

 

0.0126

10.2

 

 

 

20.4

 

lb/sft

 

 

 

 

 

 

 

 

 

 

 

 

Tk. 70,000.00

Tk. 50.00

Tk. 50.00

Tk. 36.00

Tk. 70,000.00

 

Rate (Tk.)

LS

Tk. 390.00

Tk. 390.00

Tk. 800.00

 

Tk. 25.00

Tk. 25.00

Tk. 25.00

Tk. 25.00

Tk. 25.00

 

Tk. 55,000.00

p/Mton

p/nos

tk/rft

tk/rft

p/Mton

 

Unit

 

 

 

 

 

tk/rft

tk/rft

tk/rft

tk/rft

tk/rft

 

p/Mton

Tk. 2,100.00

Tk. 100.00

Tk. 600.00

Tk. 432.00

Tk. 2,917.99

 

Total (Tk.)

Tk. 195.00

Tk. 195.00

Tk. 97.50

Tk. 100.00

 

Tk. 283.40

Tk. 37.50

Tk. 266.00

Tk. 66.00

Tk. 133.00

 

Tk. 691.87