Sub - Total = Tk. 10,444.71 Profit 10.00% Tk. 1,044.47 Add VAT with adjustment 1.06383 6.00% Tk. 756.69 Grand Total = Tk. 12,611.43 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| (g) |
|
|
| (e) | Analysis of PWD SoR 2018 for Civil Works 214 |
Local carriage & sundry | Helper | Skilled labor | Foreman | Labor charges for placing fitting in position | Corner Angles | U bolt to 1/2"th bed plates | 1/4"th C plate to 1/2"th bed plate | 1/4"th C plate (jacket) | top & bott plate | Arc welding | 3"x3"x1/4" Angle at Corners | Fabrication: Bending of 20mm bar in U | 20mm U bar, top & bott | 25mm dowel placed during pile cast | 1.5" G.I / MS pipe for dowel bar | 2" dia Hole in 1/4" M.S plate | Charge to bend 1/4"th MS Plates | 1/4 th MS Plate Grinding to V bevel on faces of U legs for top & bott | Cutting by shearing granding and hole for steel jacket, 1/4" plate on 2U x ( top & bott) - C or U form | ||
|
|
|
| 0.25 | 0.25 | 0.25 | 0.25 | 0.50 |
| 0.25 | 1.75 | 0.75 | 1 |
|
| 0.25 | 0.25 | 0.25 | |||
|
|
|
|
| 1.417 | 0.75 | 6 | 1.32 | 6 |
| 1.417 | 4.08 | 4.08 | 1.42 | 1 |
|
|
| 2.82 | ||
|
|
|
|
|
|
|
|
|
|
| 0.25 | 0.75 | 0.75 |
|
|
| 0.66 | 0.66 | 0.66 | ||
| 0.5 | 0.25 | 0.125 |
| 8 | 2 | 2 | 2 | 1 |
| 4 | 4 | 4 | 1 | 1 | 1 | 8 | 8 | 4 | ||
|
|
|
|
| 11.34 | 1.50 | 12.00 | 2.64 | 6.00 |
| 5.67 | 19.32 | 19.32 | 1.42 | 0.00 | 2.00 | 5.28 | 10.56 | 27.84 | ||
|
|
|
|
|
|
|
|
|
|
| 0 | 0 | 0 | 0 |
| 0 |
| 0 |
| ||
|
|
|
|
| 11.336 | 1.5 | 12 | 2.64 | 6 |
| 5.668 | 19.32 | 19.32 | 1.42 | 1 | 2 | 5.28 | 10.56 | 0 | ||
|
|
|
|
| rft | rft | rft | rft | rft |
| rft | rft | rft | rft | rft | nos | rft | rft | rft | ||
|
|
|
|
|
|
|
|
|
|
|
| 0.75 | 0.75 |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| 0.0566 |
|
|
|
|
|
|
|
| ||
0.119 |
|
|
|
|
|
|
|
|
|
| 0.0126 | 0.0145 | 0.0145 | 0.0012 |
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
LS | Tk. 390.00 | Tk. 390.00 | Tk. 800.00 |
| Tk. 25.00 | Tk. 25.00 | Tk. 25.00 | Tk. 25.00 | Tk. 25.00 |
| Tk. 55,000.00 | Tk. 5,600.00 | Tk. 60,500.00 | Tk. 60,500.00 | Tk. 180.00 | Tk. 100.00 | Tk. 30.00 | Tk. 70.00 | Tk. 13.00 | ||
|
|
|
|
| tk/rft | tk/rft | tk/rft | tk/rft | tk/rft |
| p/Mton | p/Mton | 0 | tk/rft |
| p/nos | tk/rft | tk/rft | tk/rft | ||
Tk. 195.00 | Tk. 195.00 | Tk. 97.50 | Tk. 100.00 |
| Tk. 283.40 | Tk. 37.50 | Tk. 300.00 | Tk. 66.00 | Tk. 150.00 |
| Tk. 691.87 | Tk. 81.14 | Tk. 876.65 | Tk. 71.06 |
| Tk. 200.00 | Tk. 158.40 | Tk. 739.20 | Tk. 52.00 |