(iii) Mason 2.00 no @ Tk. 500.00 each =

(f) local carriage, curing, scaffolding & sundries etc. LS =

Tk. Tk.

1,000.00

480.00

Total =

Profit 10.00% =

Overhead 3.50% =

Tk.
Tk.
Tk.

10,480.00

1,048.00

366.80

=

Tk.

11,894.80

Add VAT with adjustment factor 1.06383 6.00% =

Tk.

759.24

Grand total =

Tk.

12,654.04

Rate per sft =

Tk.

126.54

Rate per sqm =

Tk.

1,362.08

Say, Tk. 1,362 .00 per sqm

 

 

 

 

 

Item No.- 15.15.1

 

 

Minimum 12mm thick cement sand (F.M-1.2) water proof, damp proof, dry and breathable plaster (1:4) with water proof Izonil cement/equivalent compound to wall surface

 

 

Considering 100 sft. of work

  1. water proof, dampproof, dry & breathable 1.52 bags @ Tk. 1,500.00 Per bag =
    cement
  2. Sand (F.M. 1.2) 5.25 cft. @ Tk. 1,400.00 per % cft =

Tk. Tk.

2,280.00

73.50

(d) Cement 0.28 bags @ Tk. 395.00 Per bag =

(f) Labour =

  1. Head mason 0.25 no @ Tk. 600.00 each =

Tk. Tk.

110.60

150.00

  1. Mason 1.00 no @ Tk. 500.00 each =

Tk.

500.00

  1. Ordinary labour 1.00 no @ Tk. 320.00 each =

Tk.

320.00

(g) Hire charge of concrete mixer machine 0.10 no @ Tk. 1,200.00 each =

Tk.

120.00

(h) Washing of sand, local carriage, scaffolding, curing, & sundries etc. LS =

Tk.

320.00

Total =

Tk.

3,874.10

Profit 10.00% =

Tk.

387.41

Overhead 3.50% =

Tk.

135.59

=

Tk.

4,397.10

Add VAT with adjustment factor 1.06383 6.00% =

Tk.

280.67

Grand total =

Tk.

4,677.77

Rate per sft =

Tk.

46.78

Rate per sqm. =

Tk.

503.54

Say, Tk. 504 .00 per sqm

 

 

 

 

 

Item No.- 15.15.2

 

 

Minimum 19mm thick cement sand (F.M-1.2) water proof, damp proof, dry and breathable plaster (1:4) with water proof Izonil cement/equivalent compound to wall surface

 

 

Considering 100 sft. of work

  1. water proof, dampproof, dry & breathable 2.27 bags @ Tk. 1,500.00 Per bag =
    cement
  2. Sand (F.M. 1.2) 7.88 cft. @ Tk. 1,400.00 per % cft =

Tk. Tk.

3,405.00

110.32

(d) Cement 0.28 bags @ Tk. 395.00 Per bag =

(f) Labour =

(i) Head mason 0.25 no @ Tk. 600.00 each =

Tk. Tk.

110.60

150.00

  1. Mason 1.00 no @ Tk. 500.00 each =

Tk.

500.00

  1. Ordinary labour 1.00 no @ Tk. 320.00 each =

Tk.

320.00

  1. Hire charge of concrete mixer machine 0.10 no @ Tk. 1,200.00 each =

Tk.

120.00

  1. Washing of sand, local carriage, scaffolding, curing, & sundries etc. LS =

Tk.

320.00

Total =

Tk.

5,035.92

Profit 10.00% =

Tk.

503.59

Overhead 3.50% =

Tk.

176.26

=

Tk.

5,715.77

Add VAT with adjustment factor 1.06383 6.00% =

Tk.

364.84

Grand total =

Tk.

6,080.61

Rate per sft =

Tk.

60.81

Rate per sqm. =

Tk.

654.56

Say, Tk. 655 .00 per sqm