Item No.- 18.1.1

 

 

 

 

 

1/2" thick plain particle board ceiling screwed up with wooden frame for normal room height Considering a panel of 12' x 16'= 192 sft of work

  1. Cost of Garjan wood:

 

 

 

 

(7 x 16' + 9 x 12') x 3" x 2"= 9.17 cft

 

 

 

 

 

Add 5% wastage= 0.46 cft

2,000.00

per cft

=

Tk.

19,260.00

9.63 cft @ Tk.

  1. Cost of 1/2" thick plain particle board

12'-0" x 16'-0"= 192 sft

Add 5% wastage= 9.6 sft

38.00

600.00

per sft

each

=

=

=

Tk.

Tk.

Tk.

7,660.80

2,019.06

6,000.00

201.6 sft @ Tk.

  1. Cost of G.I. wire, rowel plug, nails and screws etc. necessary for fabricating, hoisting and hanging frame and board (7.5% of cost of wood and board)
  2. Cost of fitting, fixing, levelling, finishing, scaffolding etc (upto 3.5 m height)

(i) Carpenter 10 nos @ Tk.

  1. Carpenter helper 10 nos @ Tk.
  2. Painting 2 coats over a coat of priming (rate is 50%

more than the normal rate) 192 sft @ Tk.

390.00

2,183.25

each
per %sft

=

=

Tk. Tk.

3,900.00

4,191.84

 

 

Sub - Total

=

Tk.

43,031.70

 

Profit

10.00%

=

Tk.

4,303.17

 

Overhead

3.50%

=

Tk.

1,506.11

 

 

Total

=

Tk.

48,840.98

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

3,117.51

 

 

Grand Total

=

Tk.

51,958.49

 

 

Rate per sft

=

Tk.

270.62

 

 

Rate per sqm

=

Tk.

2,912.95

Say, Tk.

2,913 .00 per sqm

 

 

 

 

 

 

 

 

 

Item No.- 18.1.2

 

 

 

 

 

1/2" thick plain particle board ceiling screwed up with wooden frame for auditorium and other tall structures beyond 3.5 meter upto 6 meter height.

 

 

 

 

 

Consider 1 No. panel

 

 

 

 

 

Considering a panel of 12'-0" x 16'-0"= 192 sft of work

  1. Cost of materials and labour
  2. Scaffolding beyond 12' upto 20' (double stage)

2 x 16'-0" x 12'-0"= 384 sft @ Tk.

9.00

per sft

=

=

Tk. Tk.

43,031.70

3,456.00

 

 

Sub - Total

=

Tk.

46,487.70

 

Profit

10.00%

=

Tk.

4,648.77

 

Overhead

3.50%

=

Tk.

1,627.07

 

 

Total

=

Tk.

52,763.54

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

3,367.89

 

 

Grand Total

=

Tk.

56,131.43

 

 

Rate per sft

=

Tk.

292.35

 

 

Rate per sqm

=

Tk.

3,146.86

Say, Tk.

3,147 .00 per sqm

 

 

 

 

 

 

 

 

 

Item No.- 18.1.3

 

 

 

 

 

Supplying, fitting and fixing of 8 mm thick melamine board laminated by mechanical hot press with a milk white PVC membrance with aluminum frame suspended from ceiling.

 

 

 

 

 

Consider 16'-0" x 10'-0"= 160 sft of work

(A) Materials

  1. Malamine board (8 mm thick):

 

 

 

 

 

8' -0" x 4'-0" size 5 pcs @ Tk.

2,150.00

per pc

=

Tk.

10,750.00

  1. Aluminium section & accessories
  1. 1" main T-section 64.00 rft @ Tk.

25.00

per rft

=

Tk.

1,600.00

  1. 1" cross T-section 30.00 rft @ Tk.

22.00

per rft

=

Tk.

660.00