Item No.- 22.13.1 |
|
|
|
|
|
|
| |
Supplying and fitting-fixing uPVC plastic partion with hollow section: (size 2 m x 3 m) Considering 1 No. partition of 6 sqm |
|
|
|
|
|
|
| |
| @ | Tk. |
| 130.00 | Per rm | = | Tk. | 1,170.00 |
| @ | Tk. |
| 130.00 | Per rm | = | Tk. | 1,300.00 |
| @ | Tk. |
| 60.00 | Per rm | = | Tk. | 1,680.00 |
| @ | Tk. |
| 9.00 | each | = | Tk. | 126.00 |
| @ | Tk. |
| 14.00 | each | = | Tk. | 56.00 |
| @ | Tk. |
| 1.50 | each | = | Tk. | 120.00 |
| @ | Tk. |
| 2.00 | each | = | Tk. | 48.00 |
| @ | Tk. |
| 1.00 | each | = | Tk. | 24.00 |
| @ | Tk. |
| 880.00 | per sqm | = | Tk. | 5,280.00 |
| @ | Tk. |
| 600.00 | per day | = | Tk. | 2,700.00 |
| @ | Tk. |
| 390.00 | per day | = | Tk. | 585.00 |
|
|
|
|
| LS. | = | Tk. | 160.00 |
|
|
|
|
| Sub - Total | = | Tk. | 13,249.00 |
|
|
| Profit | 10.00% | = | Tk. | 1,324.90 | |
|
|
| Overhead | 3.50% | = | Tk. | 463.72 | |
|
|
|
|
| Total | = | Tk. | 15,037.62 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 959.85 | ||
|
|
|
|
| Grand Total | = | Tk. | 15,997.47 |
|
|
|
|
| Rate per sqm | = | Tk. | 2,666.25 |
| Say, | Tk. |
| 2,666 .00 per sqm |
|
|
| |
|
|
|
|
|
|
|
|
|
Item No.- 22.13.2 |
|
|
|
|
|
|
|
|
Supplying and fitting-fixing uPVC plastic partion with glass: (size 2 m x 3 m) |
|
|
|
|
|
|
|
|
Considering 1 No. partition of 6 sqm |
|
|
|
|
|
|
|
|
| @ | Tk. |
| 130.00 | Per rm | = | Tk. | 1,170.00 |
| @ | Tk. |
| 130.00 | Per rm | = | Tk. | 1,300.00 |
| @ | Tk. |
| 60.00 | Per rm | = | Tk. | 1,680.00 |
| @ | Tk. |
| 20.00 | Per rm | = | Tk. | 280.00 |
| @ | Tk. |
| 10.00 | Per rm | = | Tk. | 40.00 |
| @ | Tk. |
| 9.00 | each | = | Tk. | 720.00 |
| @ | Tk. |
| 14.00 | each | = | Tk. | 336.00 |
| @ | Tk. |
| 1.50 | each | = | Tk. | 36.00 |
| @ | Tk. |
| 2.00 | each | = | Tk. | 12.00 |
| @ | Tk. |
| 1.00 | each | = | Tk. | 4.50 |
| @ | Tk. |
| 200.00 | Per kg | = | Tk. | 300.00 |
| @ | Tk. |
| 300.00 | per sqm | = | Tk. | 1,800.00 |
| @ | Tk. |
| 600.00 | per day | = | Tk. | 1,800.00 |
| @ | Tk. |
| 390.00 | per day | = | Tk. | 1,170.00 |
|
|
|
|
| LS. | = | Tk. | 160.00 |
|
|
|
|
| Sub - Total | = | Tk. | 10,808.50 |
|
|
| Profit | 10.00% | = | Tk. | 1,080.85 | |
|
|
| Overhead | 3.50% | = | Tk. | 378.30 | |
|
|
|
|
| Total | = | Tk. | 12,267.65 |
Add VAT with adjustment factor |
| 1.06383 | 6.00% | = | Tk. | 783.04 | ||
|
|
|
|
| Grand Total | = | Tk. | 13,050.69 |
|
|
|
|
| Rate per sqm | = | Tk. | 2,175.12 |
| Say, | Tk. |
| 2,175 .00 per sqm |
|
|
| |
|
|
|
|
|
|
|
|
|
Item No.- 22.14 |
|
|
|
|
|
|
|
|
uPVC door frame (chowkat) (For solid door) |
|
|
|
|
|
|
|
|
Considering 7'-0" x 2'-6"size door = 16.50 rft chowkat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Partition frame 17 rft | @ | Tk. |
| 60.00 | per rft | = |
| Tk.1,020.00 |
|
|
|
|
|
|
|
|
|
Partition frame 14 rft | @ | Tk. |
| 28.00 | per rft | = |
| Tk.392.00 |
| @ | Tk. |
| 10.00 | each | = |
| Tk.60.00 |
|
|
|
|
| LS. | = | Tk. | 25.00 |