1.00 no @

Total for 1 set Prop.
Cost for 88 nos prop

Tk. 600.00 each

=

Tk.

600.00

 

=

=

Tk. 2,385.00

Tk. 209,880.00

  1.  

2" dia M.S. pipe for cross bracing:

 

 

 

 

 

9 x 18'-0"=

162.00 rft @

Tk. 140.00 per rft

=

Tk. 22,680.00

 

 

 

Sub-total

=

Tk. 232,560.00

 

 

Considering 50 times use

 

=

Tk.

4,651.20

  1.  

Labour cost for fitting fixing steel shutter and props in position and removing etc.:

 

 

 

 

 

 

20'-0" x 16'-0"=

320.00 sft

 

 

 

 

 

2 x (20'-0" + 16'-0") x 5"=

30.00 sft

 

 

 

 

 

=

350.00 sft @

Tk. 15.00 per sft

=

Tk.

5,250.00

  1.  

Hessian tap for making shutter

 

 

 

 

 

 

water-tight

350.00 sft @

Tk. 1.25 per sft

=

Tk.

437.50

(i)

Curing for 28 days for surface area

350.00 sft @

Tk. 2.67 per sft

=

Tk.

934.50

 

 

 

Grand total

=

Tk.

14,325.67

 

 

 

Cost per sft

=

Tk.

40.93

 

 

 

Cost per sqm

=

Tk.

440.57

C-17

CORNICE, DROP-WALLS, RAILING, LOUVER AND FINS etc. using STEEL shutter

 

 

 

 

 

 

Assuming 10'-0" x 3'-0"= 30 sft drop walls

 

 

 

 

 

 

Shuttering Area: 62.50 sft

 

 

 

 

 

  1.  

1" x 1" x 1/8" M.S. angle for frame

 

 

 

 

 

 

2 x 3 x 10'-3"=

61.50 rft

 

 

 

 

 

2 x 2 x 3'-1.5"=

12.50 rft

 

 

 

 

 

2 x 0'-5" =

0.83 rft

 

 

 

 

 

 

74.83 rft

 

 

 

 

 

Add 5% wastage=

3.74 rft

 

 

 

 

 

=

78.57 rft

 

 

 

 

 

@ 0.80 Ibs per rft=

62.86 Ibs @

Tk. 24.94 per Ibs

=

Tk.

1,567.73

  1.  

1" x 1/8" F.I. bar for frame & stiffner

 

 

 

 

 

 

2 x 14 x 3'-0" =

84.00 rft

 

 

 

 

 

2 x 4 x 10'-0" =

80.00 rft

 

 

 

 

 

1 x 14 x 0'-5" =

5.83 rft

 

 

 

 

 

4 x 0'-5" =

1.67 rft

 

 

 

 

 

 

171.50 rft

 

 

 

 

 

Add 5% wastage =

8.58 rft

 

 

 

 

 

 

180.08 rft

 

 

 

 

 

@0.43.00 Ibs per rft =

77.43 Ibs @

Tk. 24.94 per Ibs

=

Tk.

1,931.10

  1.  

18 BWG M.S sheet

 

 

 

 

 

 

2 x 10'-0" x 3'-0"=

60.00 sft

 

 

 

 

 

1 x 10' - 0" x 0'-5" =

4.17 sft

 

 

 

 

 

 

64.17 sft

 

 

 

 

 

Add 5% wastage=

3.21 sft

 

 

 

 

 

 

67.38 sft

 

 

 

 

 

@ 2.04Ibs per sft=

137.46 Ibs @

Tk. 27.44 per Ibs

=

Tk.

3,771.90

  1.  

Fabrication steel shutter:

64.17 sft @

Tk. 75.00 per sft

=

Tk.

4,812.75

  1.  

Nuts, bolts, J- hooks etc.

5.00 kg @

Tk. 160.00 per kg

=

Tk.

800.00

 

 

 

Total

=

Tk.

12,883.48

 

 

Considering 30 times use

 

=

Tk.

429.45

  1.  

Wooden batten under steel shutter & inclined support

 

 

 

 

 

 

4 x 3'-6" x 3" x 2" =

0.58 cft

 

 

 

 

 

2 x 4 x 3' - 4" x 2" x 2 ' =

0.74 cft

 

 

 

 

 

 

1.32 cft

 

 

 

 

 

Add 5% wastage=

0.07 cft

 

 

 

 

 

 

1.39 cft @

Tk. 500.00 per cft

 

 

 

 

 

Considering 6 times use

 

=

Tk.

115.83

  1.  

2"/1.5" dia M.S. props in/c adjustable mechanism with top and bottom plate etc.

4 nos @

Tk. 1,650.00 each