Prev Next
īģŋ

  1.  

Labour for fitting and fixing steel shutter & props in position:

Considering 50 times use

 

 

=

Tk.

132.00

 

2 x 10'-0" x 3'-0"=

60.00 sft

 

 

 

 

 

 

10' - 0" x 3"=

2.50 sft

 

 

 

 

 

 

 

62.50 sft @

Tk.

15.00 per sft

=

Tk.

937.50

  1.  

Hessian tape for making

 

 

 

 

 

 

 

shutter water-tight

62.50 sft @

Tk.

1.25 per sft

=

Tk.

78.13

  1.  

Curing for 28 days for surface area

62.50 sft @

Tk.

2.67 per sft

=

Tk.

166.88

 

 

 

 

Total

=

Tk.

1,859.79

 

 

 

 

Cost per sft

=

Tk.

29.76

 

 

 

 

Cost per sqm

=

Tk.

320.34

C-18

SUNSHADE using STEEL shutter

 

 

 

 

 

 

 

Assuming 10'-0" x 3'-0"= 30 sft sun-shade

 

 

 

 

 

 

 

Shuttering Area: 34 sft

 

 

 

 

 

 

(i)

1.5" x 1.5" x 3/16" M.S. angle for frame

 

 

 

 

 

 

 

2 x 10'-3"=

20.50 rft

 

 

 

 

 

 

2 x 2 x 3'-1.5"=

12.50 rft

 

 

 

 

 

 

 

33.00 rft

 

 

 

 

 

 

Add 5% wastage=

1.65 rft

 

 

 

 

 

 

=

34.65 rft

 

 

 

 

 

 

@ 1.79 Ibs per rft=

62.02 Ibs @

Tk.

24.94 per Ibs

=

Tk.

1,546.78

(ii)

1" x 3/16" F.I. bar for stiffner:

 

 

 

 

 

 

 

2 x 10'-3"=

20.50 rft

 

 

 

 

 

 

2 x 3 x 0'-3"=

1.50 rft

 

 

 

 

 

 

=

22.00 rft

 

 

 

 

 

 

Add 5% wastage=

1.10 rft

 

 

 

 

 

 

=

23.10 rft

 

 

 

 

 

 

@ 0.64 Ibs per rft=

14.78 Ibs @

Tk.

24.94 per Ibs

=

Tk.

368.61

(iii)

16 BWG steel sheet

 

 

 

 

 

 

 

1 x 10'-0" x 3'-0"=

30.00 sft

 

 

 

 

 

 

Add 5% wastage=

1.50 sft

 

 

 

 

 

 

 

31.50 sft

 

 

 

 

 

 

@ 2.44 Ibs per sft=

76.86 Ibs @

Tk.

27.44 per Ibs

=

Tk.

2,109.04

(iv)

Fabrication steel shutter:

30.00 sft @

Tk.

75.00 per sft

=

Tk.

2,250.00

(v)

Cost of nuts, bolts, J- hooks etc.

0.50 kg @

Tk.

160.00 per kg

=

Tk.

80.00

 

 

 

 

Total

=

Tk.

6,354.43

 

 

Considering 30 times use

 

 

=

Tk.

211.81

(vi)

Wooden side shutter:

 

 

 

 

 

 

 

1 x 10'-0" x 3" x 1.5"=

0.31 cft

 

 

 

 

 

 

2 x 3'-1.5" x 3" x 1.5"=

0.20 cft

 

 

 

 

 

 

=

0.51 cft

 

 

 

 

 

 

Add 5% wastage=

0.03 cft

 

 

 

 

 

 

 

0.54 cft @

Tk.

500.00 per cft

 

 

 

 

 

Considering 6 times use

 

 

=

Tk.

45.00

(vii)

4" x 2" box channel under steel shutter

 

 

 

 

 

 

 

4 x 4'-0"=

16 rft @

Tk.

350.00 per rft

 

 

 

 

 

Considering 50 times use

 

 

=

Tk.

112.00

(viii)

2"/1.5" dia M.S. props in/c adjustable mechanism with top and bottom plate etc.

4 nos @

Tk.

1,650.00 each

 

 

 

 

 

Considering 50 times use

 

 

=

Tk.

132.00

(ix)

Labour for fitting and fixing steel shutter & props in position as required.:

 

 

 

 

 

 

 

1 x 10'-0" x 3'-0" =

30.00 sft

 

 

 

 

 

 

(3'-0" + 10'-0" + 3'-0") x 3" =

4.00 sft

 

 

 

 

 

 

 

34.00 sft @

Tk.

15.00 per sft

=

Tk.

510.00

(x)

Hessian tap for making

 

 

 

 

 

 

 

shutter water-tight

34.00 sft @

Tk.

1.25 per sft

=

Tk.

42.50

(xi)

Curing for 28 days for surface area

34.00 sft @

Tk.

2.67 per sft

=

Tk.

90.78

 

 

 

 

Total

=

Tk.

1,144.09

 

 

 

 

Cost per sft

=

Tk.

33.65